Wednesday, September 30, 2015

Basement Bathroom Remodel

Doing another exciting basement bathroom renovation in Etobicoke.  We just levelled out the bathroom after repositioning some of the plumbing locations.  We are building out a nice custom wall to wall seated bench contained within the shower area with numerous body jets, double rain showerheads and a long linear floor drain channel.  We are looking forward to sharing some more pictures after the final revel once we finish off the bathroom.

Before During After Pics Etobicoke Bathroom Reno
Before During After Pics of Etobicoke Bathroom Reno